ZAO Severorgsintez
Customer: ZAO Severorgsintez
Work description: Gas Processing Industrial Complex UPBS-100. Production area of Novy Urengoy
Types of works performed: development of design and detail documentation, development of process procedure of the full profile gas processing plant, packaged equipment supply, designer’s supervision over construction and installation supervision over commissioning
Capacity: 1.5 bln m3/year
Year: 2008
The works were carried out based on EPC procedure at the project. Engineering, mechanical design, release for manufacturing, delivery and installation were carried out simultaneously that enabled to fulfill the whole scope within tight deadlines.
Recovery rate: 98%
Feedstock:
Natural gas from the gas treatment unit
P 3.9 MPa abs.,
Contents of target components up to 100 g/std. m3.
The products recovered:
Dry stripped gas – 1.2 bln std. m3/year corresponds to OST 51.40-93,
Contents of target components up to 8 g/std. m3
Autogas – 96.44 ths. t/year corresponds to GOST R 52087-2003
The project provides the possibility to recover technical propane butane, autogas according to GOST 52087-2003
The following was supplied:
Letter of appreciation of ZAO Severorgsintez