EPCM contract

Execution of EPCM projects

 
Key business line of LENNIIHIMMASH Group is execution of large-scale EPCM projects on construction and upgrade of gas processing plants by providing customers with full range of services in the sphere of design, supply, construction and project management.

Over the last 9 years, LENNIIHIMMASH Group has successfully completed several EPCM contracts both independently and jointly with leading equipment manufacturers of gas-chemical and petrochemical industry:

2015 г. Vyngapurovsky gas processing plant with capacity of 3,5 bln m3/year for hydrocarbon gas. Customer: PAO SIBUR.
 
2014 г. Reconstruction of Low Temperature Condensation and Rectification Unit. Construction of the second line for associated petroleum gas processing. Customer: OAO Lukoil-Permneftegazopererabotka.
 
2012 г. Line of Yuzhno-Balyksky gas processing plant with capacity of 2.0 bln m3/year for hydrocarbon gas. Customer: PAO SIBUR.
 
2010 г. Line of Gubkinsky gas processing plant with capacity of 2.0 bln m3/year for hydrocarbon gas. Customer: PAO SIBUR.
 
2008 г. Construction of UPBS-100 production complex for processing of gas of Vostochno-Urengoiskoe and Severo-Esetinskoe oil and gas condensate fields with capacity of 1.5 bln m3/year for hydrocarbon gas. Customer: ZAO Severorgsintez.

 

Competences of LENNIIHIMMASH Group comprise highly-qualified engineering, production, construction and management functions:

  • engineering stage varies from conceptual plant design to full detail design of the required equipment and units;
  • procurement stage includes complete contracting procedure with the equipment manufacturer, equipment delivery and storage, as well as delivery of construction materials and rendering of services necessary during contract implementation;
  • construction stage covers activities on installation, testing and start-up of both a single piece of machinery and a complete plant;
  • project management is carried out by an expert team, with responsible specialists being assigned for each work stage.

 
Comparative advantages of LENNIIHIMMASH Group within EPCM project execution

When executing large-scale projects, benefits of potential customers are based on the following comparative advantages of LENNIIHIMMASH Group:

1. Expert on EPCM contracts in gas-chemical industry

The whole staff of LENNIIHIMMASH Group is involved in project execution. Excellent skills in project management in combination with a wide range of functional knowledge in the following spheres:

  • process,
  • engineering,
  • procurement,
  • logistics,
  • construction,
  • quality management,
  • risk management,
  • commissioning and start-up,

enable LENNIIHIMMASH Group to execute progressively challengingEPCM projects for demanding customers in accordance with the highest process standards.

2. Highly-qualified team of engineers

LENNIIHIMMASH Group permanently expands its competencies by means of human-capital investments. Having more than 300 qualified employees and more than 100 highly-qualified engineers together with the unified integrated modeling environment of process (HYSYS), 3D engineering (AVEVA PDMS) and project management (PRIMAVERA), the company has full range of resources and the experience required for EPCM project execution.

3. On time and on budget

LENNIIHIMMASH Group strictly complies with the agreements and obligations. The EPCM projects executed by the company have been completed within the deadlines and budget established by the contractual obligations.

4. 4Flexibility and persistence

LENNIIHIMMASH Group has proper persistence for successful management of large projects, while remaining flexible for quick and efficient respond to changes of project external environment, as well as maintaining ability to implement several projects simultaniasly with world-class performance. The company has both financial power and stability that are of crucial importance for viability of industrial plant construction and upgrade projects.

With more than 80 years of experience, LENNIIHIMMASH Group has vast recommendations and acknowledgment of successful execution of large projects on construction of gas processing plants in harsh environments, on schedule and within limited budget.