Major implemented projects >  Expansion of Vyngapurovsky gas processing plant. Construction of gas processing facility No.2 (UPG-2)

Expansion of Vyngapurovsky gas processing plant. Construction of gas processing facility No.2 (UPG-2)

OAO SiburTyumenGaz

Customer: OAO SiburTyumenGaz
Work description: Expansion of Vyngapurovsky gas processing plant. Construction of gas processing facility No. 2. (UPG-2);
Types of works performed: carrying out functions of General designer, development of design and detail documentation, receipt of approval issued by Glavgosexpertiza of Russia, delivery of process equipment and materials above and below zero, designer’s supervision over construction, carrying out of installation works and commissioning, start-up of the facility with further ramp-up;

Unit capacity: as for compression and dehydration – 1.6 bln std. m3/year, as for processing – 1.4 bln std. m3/year

Project implementation period: 2013 – 2015 гг. (24 months)
Feed stock:

  • Associated petroleum gas from Varyeganskaya compressor station;
  • Contents of target components С3+ 301,1 g/ std. m3

Market products:

  • Dry stripped gas corresponds to STO 089-2010, contents of target components not more than 3 g/ std. m3;
  • NGL according to TU 38.101524-93;

CAPEX for the project: 11.536 bln RUB incl. VAT
LENNIIHIMMASH Group investment development share: 8,098 bln RUB incl. VAT

Total structural steel weight: 1468,45 tons.
Total weight of the equipment supplied of more than 2000 tons:

  • Column equipment – 1 pce.
  • Vessel equipment – 28 pcs.
  • Heat exchanging equipment – 10 pcs.
  • Compressor equipment – 5 pcs.
  • Furnace equipment – 2 pcs.
  • Air coolers – 26 pcs.
  • Turbo-expander – 1 pce.
  • Pumping equipment - 20 pcs.
  • Valves – 3522 pcs.
  • Instrumentation – 950 pcs.
  • Automated process control system – 2736 signals.
  • Sewage pumping stations – 2 pcs.
  • Nitrogen air plant – 1 pce.
  • Electrical equipment (power distribution station – 6kV)
  • Carrying and lifting equipment – 18 pcs.
  • Fire hydrant chambers – 2 pcs.
  • Fire-fighting monitors “Starzh” – 25 pcs.
  • Equipment of automatic firefighting system, fire alarm system, communication systems, security systems – systems for the whole plant

Photo gallery of facility construction progress of OAO SiburTumenGas