Major implemented projects >  LUKOIL-Permneftegaspererabotka

LUKOIL-Permneftegaspererabotka



OAO LUKOIL-Permneftegaspererabotka

Customer: OAO LUKOIL-Permneftegaspererabotka
Work description: Reconstruction of low temperature condensation and rectification unit. Construction of the second line for associated petroleum gas processing;
Types of works performed: carrying out functions of General designer, development of design and detail documentation, receipt of approval issued by Glavgosexpertiza of Russia, packaged equipment supply, designer’s supervision over construction, installation supervision over installation works and commissioning with further ramp-up of the facility;

Project implementation period: 2012-2014 гг. (20 months);

Capacity of the second line of APG processings:

  • As for APG - 900 mln std. m3/year;
  • As for additional NGL - 512 ths. tons/year;

Capacity range – 50-115% of rated flow.

Feed stock:

  • Associated petroleum gas;
  • NGL of Lokosovsky Gas Processing Plant

Market products:

  • Dry stripped gas – 654 mln std. m3/year;
  • Ethane fraction – 94.7 ths. tons/year;
  • Propane fraction – 296.5 ths. tons/year;
  • Propane-butane-pentane fraction – 119.7 ths. tons/year;
  • i-butane fraction – 80.7 ths. tons/year;
  • n-butane fraction – 192.7 ths. tons/year.

Scope of the process equipment supplied within the contract:

  • Gas turbo-compressor – 2
  • Electric-driven compressor – 4
  • Turbo-expander – 1
  • Sewage pumping stations – 3
  • Column equipment – 6
  • Heat exchanging equipment – 50
  • Pumping equipment (incl. firefighting) – 43
  • Vessel equipment – 56
  • Heat recovery unit of feed compressor gas turbines – 2
  • Air cooler – 5
  • Condensate treatment unit – 1
  • Condensate collection and transfer unit – 3
  • Deaerator – 2
  • Odorization unit – 1
  • Vertical-circular fired furnace - 1
  • Flare unit with two sinking stacks – 1
  • Nitrogen air station – 1
  • Chemical treatment unit – 1
  • Electrical equipment (power distribution station – 6kV)
  • Carrying and lifting equipment – 23
  • Equipment of automatic firefighting system, fire alarm system, communication systems, security systems – systems for the whole plant
  • Instrumentation and Automation – 1765
  • Automated process control system (work station, server, printers, fibre-optic connection, etc. (on the basis of Yakogawa equipment)
  • Control signals – 5820
  • Shutoff and control valves (manual shutoff valves, actuated shutoff valves, control and safety valves, check valves) – 5017 pcs.

CAPEX for the project: 10.4 bln RUB incl. VAT
LENNIIHIMMASH Group investment development share: 5,3 bln RUB incl. VAT

Photo gallery of facility construction progress of OAO LUKOIL-Permneftegaspererabotka