News >  Ceremonial commissioning of the second production line “LUKOIL-Permnefteorgsintez” LLC

Ceremonial commissioning of the second production line “LUKOIL-Permnefteorgsintez” LLC

 LENNIICHIMMASH Group» acted as EP-contractor, which included works of General Designer in elaboration of project and detailed design documentation and acquiring approval of «Glavgosekpertiza of Russia» and packaged equipment supply for the project «NTKR Reconstruction». Construction of the second line of processing associated petroleum gass» with the capacity of 1 billion m3/year for petroleum gas, 600 million tons/year for WFLH to the order of «LUKOIL-Permneftegazpererabotka» LLC (the company was reorganized and now is «LUKOIL-Permnefteorgsintez» LLC). More than 200 units of processing equipment were supplied within the scope of the project:

 

Gas turbine compressors
2 units
Electrical compressors
4 units
Turbo expander
1 unit
Column equipment
6 units
Heat exchangers
50 units
Pumping equipment
43 units
Vessel equipment
56 units
Heat recovery unit of feed compressor gas turbines
2 units
Fired heater furnace
1 unit
Odorization unit
1 unit
Flare system with two lowerable stacks
1 unit
Nitrogen Air station
1 unit
Chemical preparation unit
1 unit
Instrumentation and analyzers
1765 pcs
Shut-off and control valves
5017 pcs
DCS equipment
5820 control signals

 

Construction of around 20 main and auxiliary facilities was completed as part of the project. A number of production facilities were reconstructed and existing utilities were partly replaced. Main process facilities were built: compressor unit with gas-turbine drive, heat recovery unit, dehydration unit, low-temperature condensation and rectification unit, gas fractionation unit.

Investment utilization share of «LENNIICHIMMASH Group» is 176 million USDs.
 
The facility was put into operation on May 27, 2015. Vagit Alekperov, OAO «LUKOIL» President, Mikhail Babich, Presidential Plenipotentiary Envoy to the Volga Federal District, and Viktor Basargin, Governor of Perm Territory, took part in the ceremonial commissioning.

Mr. Alekperov, OAO «LUKOIL» President, commented in his official speech:: «The commissioning of the new facility in Perm is yet another significant step as part of the recent large-scope program to upgrade the processing capacities. Not only will the program make it possible to raise the utilization level of associated petroleum gas in Perm Krai to 95%. What’s more, the program will unlock synergies for LUKOIL Group’s organizations in the Perm territory through the production of associated petroleum gas, its processing and power generation».