Contacts

Russia,
199155, St.В Petersburg,
Uralskaya ul., 19, letter D, bld. 5

Tel.: +7(812) 327-7960
Fax: +7(812) 327-7692

 

office@niihimmash.com

 

 

website clock часы для сайтов
 


Projects >  Current projects >  Expansion of the Vyngapurovsky GPZ

Expansion of the Vyngapurovsky GPZ



JSC SiburTyumenGaz 

Customer: JSC SiburTyumenGaz
Name of the project: "Expansion of the Vyngapurovsky GPZ. Construction of the unit of gas processing  No. 2 (UPG-2)";
Types of the performed works: implementation of the General designer function, development of project and working documentation, obtaining the positive conclusion of FAU "Glavgosekspertiza of Russia", delivery of processing equipment and materials  higher and lower than "zero", architectural supervision of construction, implementation of installation and commissioning, start-up of installation with approaching  to technological parameters;
 
Installation Output: 1.4  bln. m3/year on hydrocarbonic gas.

Term of the project implementation: 2013 – 2015 (24 months)
 
Unit "entrance":
  • Mix of hydrocarbonic gases (APG)
  • Maintenance of target components (seasonally):
  • C3 + 301,105 g/St. m3
Unit "exit" (WLHF /et. WLHF):
  • Dry stripped gas corresponds СТО 089-2010
  • WLHF on ТУ 38.101524-93 A, B brands
  • Maintenance of target components no more than 3 g / St. m3
The Unit works in two modes of receiving WLHF:
  • on ТУ 38.101524-93
  • Ethanizing of WLHF

Gross weight of a metalwork: 1468,45 tons.
 
Gross weight of the delivered equipment more than 2000 tons:
  • Columned equipment – 1 pcs.
  • Capacitor equipment – 28 pcs.
  • Heatexchange equipment – 10 pcs.
  • Compressor equipment – 5 pcs.
  • Furnace equipment – 2 pcs.
  • Air coolers – 26 pcs.
  • Turbine expander – 1 pcs.
  • Pump equipment – 20 pcs.
  • Fittings – 3 522 pcs.
  • Instrumentation equipment – 9 50 pcs.
  • Industrial control system - 2 736 signals.
  • Sewer Pump Stations (SPS) – 2 pcs.
  • Nitrogen-air station – 1 pcs.
  • Electrotechnical equipment (distributive area-6kv)
  • Lifting-and-conveying  equipment – 18 pcs.
  • Cameras of fire hydrants – 2ed.
  • Carriage hoses "Starzh" – 25 pcs.
  • Equipment of automatic fire extinguishing, fire alarm system, communication systems, system of protection – systems on all plant.
Capital expenditure on the project: 7,9 bln. rubles with the VAT
 
Share of investments development of LENNIICHIMMASH Group: 6,6 bln. rubles with the VAT