JSC Lukoil Permneftegazpererabotka

 

Customer: JSC Lukoil Permneftegazpererabotka
Name of the project: "Reconstruction of “NTKR”. Construction of the second line for associated oil gas processing ";
 
Types of the performed works: implementation of the General designer  function, development of project and working documentation, obtaining the positive conclusion of FAU "Glavgosekspertiza of Russia", complex supply of equipment, architectural supervision of construction, chief supervision of installation and commissioning with approaching  of  installation to technological parameters;
 
Output: oil gas – 1 bln. m3/year, WLHF – 600 million tons/year;

Term of implementation of the project: 2012-2014 (20 months);
 
Output of the second “NTKR” line:
  • on  compressing of the oil gas coming to all production with nominal expense 900 mln.st.m3/year;
  • on the oil gas coming to the projected production with nominal  expense of 900 million with t.m3/year;
  • on WLHF coming in addition to the “NTKR” , nominal. expense of 512 th. tons/year;
 
Efficiency range of a oil gas compressor of 50-115% of a nominal expense.
Efficiency range of “NTKR” and GFU on oil gas of 50-115% of a nominal expense.
Efficiency range of “NTKR” and GFU on WLHF of 50-115% of a nominal expense.

Initial raw materials:
  • Oil gas of 0,9 bln. m3/year
  • WLHF of Lokosovsky GPP 650 th.t/year
  • Fat gas of LUKOIL-Permnefteorgsintez 0,15 - 0,23 billion m3/year
  • WLHF of  LUKOIL-Permnefteorgsintez 203 th.t/year
The received raw materials:
  • Izobutane fr.44,06-51,98 th.t/year
  • Propane fr.79,53-100,2 th.t/year
  • Geksan-geptane fr.6,5-6,75 th.t/year 
  • n-Pentane fr.8,3-9,06 th.t/year
  • Izopentane fr.13,3-14,77 th.t/year 
  • Dry stripped gaz.98-166,6 mln. m3/year
  • Propane fr. 410 th.t/year
  • n-Butane fr.245,5 th.t/year 
  • Etane fr. 150,3 th.t/year
  • Dry stripped gaz.638,1  mln. m3/year

 Delivered processing equipment volume under the contract:
  • Compressor with the gas turbine — 2 pcs.
  • Compressor with the electric drive — 4 pcs.
  • Turbine expander unit — 1 pcs.
  • Sewer Pump Stations (SPS) — 3 pcs.
  • Columned equipment — 6 pcs.
  • Heatexchange equipment — 50 pcs.
  • Pump (including fire-fighting equipment) — 43 pcs.
  • Capacitor equipment — 56 pcs.
  • Block of heat of gas turbines utilization of raw compressors — 2 pcs.
  • Air cooler — 5 pcs.
  • Condensate preparation unit — 1 pcs.
  • Unit of collecting and pumping of condensate — 3 pcs.
  • Deaerator — 2 pcs.
  • Furnace of fire heating (vertical cylindrical) — 1 pcs.
  • Odorization block — 1 pcs.
  • Flare facility unit with two lowering trunks — 1 pcs.
  • Nitrogen air station — 1 pcs.
  • Chemical preparation unit — 1 pcs.
  • Electrotechnical equipment (distributive area RP-6kv)
  • Lifting-and-conveying  equipment — 23 pcs.
  • Equipment of automatic fire extinguishing, fire alarm system, communication systems,       system of protection – systems on all plant.
  • Instrumentation equipment and Analytics — 1765 pcs.
  • Industrial control system (workplaces of operators (automated workplaces), servers, printers, fiber-optic connection, etc. (on the basis of the equipment of Iokogava  electric)
  • Control  management signals  — 5820 pcs.
  • Locking regulating fittings (manual locking, locking driving, regulating, safety valves, backpressure valves) — 5017 pcs.
  • Capital expenditure on the project: 10,4 bln. rubles with the VAT.
  • Share of LENNIICHIMMASH Group investments development: 5,3 bln. rubles with the VAT.

Capital expenditure on the project: 10,4 bln. rubles with the VAT.

 Share of LENNIICHIMMASH Group investments development: 5,3 bln. rubles with the VAT.