Contacts

Russia,
199155, St.Petersburg,
Uralskaya ul., 19, letter D, bld. 5

Tel.: +7(812) 327-7960
Fax: +7(812) 327-7692

 

office@niihimmash.com

 

 

website clock часы для сайтов
 


Reference page 2

Reference page 2

Customer
LLC Gazprom dobycha Orenburg
Work description
«Calculation modeling of technical solutions, aimed at increase of ethane recovery rate from natural gas»
Types of works performed
Research report
Year
2016

 

Customer
LLC Gazprom dobycha Orenburg
Work description
«Rendering of services on approbation of the upgraded low-temperature absorption scheme at Unit 21 of the Helium plant in order to increase ethane recovery rate from natural gas»
Types of works performed
Research report
Year
2016

 

Customer
LLC Transportnaya integratsiya
Work description
«Main process solutions and options of construction of plant for liquefied natural gas production in Archangelsk region, including justification of places of its possible location»
Types of works performed
Research report
Year
2016

 

Customer
PAO Kazanorgsintez
Work description
«Assessment of capital expenses for construction of GPP for processing of wet gas of Valanzhenskie pools in the Republic of Tatarstan»
Types of works performed
Feasibility study
Year
2016

 

Customer
LLC SIBUR-Portenegro
Work description
«Development of technical solutions on i-Butane transfer at LPG transferring complex in Ust-Luga sea port»
Types of works performed
Development of main process solutions.
Year
2016

 

Customer
PAO Sibneftgaz
Work description
«Process audit of booster compressor station of Pyreynoe gas-condensate field»
Types of works performed
Technical report
Year
2016

 

Customer
LLC KINEF
Work description
«Development of detail documentation on changing of piping of compressors С-2004 A, B, S and С-2003 A, B, S of hydro cracker unit»
Types of works performed
Technical report and development of detail documentation
Year
2016

 

Customer
LLC KINEF
Work description
«Calculation of acoustic and strength characteristics of gas piping of compressors PК2,3 of unit L-35-11/600»
Types of works performed
Technical report and calculations
Year
2016

 

Customer
OAO SibuTumenGaz
Work description
«Expansion of Vyngapurovsky gas processing plant. Construction of gas processing facility No.2 (UPG-2)»
Types of works performed
Carrying out functions of General designer, development of design and detail documentation, receipt of approval issued by Glavgosexpertiza of Russia, delivery of process equipment and materials above and below zero, designer’s supervision over construction, carrying out of installation works and commissioning, start-up of the facility with further ramp-up
Capacity
1.4 bln m3/year
Year
2013-2015

 

Customer
OOO LUKOIL-Permneftegaspererabotka
Work description
«Reconstruction of low temperature condensation and rectification unit. Construction of the second line for associated petroleum gas processing»
Types of works performed
Carrying out functions of General designer, development of design and detail documentation, receipt of approval issued by Glavgosexpertiza of Russia, packaged equipment supply, designer’s supervision over construction, installation supervision over installation works and commissioning with further ramp-up of the facility
Capacity
petrolium gas - 1 bln m3/year, NGL - 0.6 bln t/year
Year
2011-2014

 

Customer OAO SibuTumenGaz
Work description «Construction of Vyngapurovsky gas processing plant»
Types of works performed Carrying out functions of General designer, development of design and detail documentation, receipt of approval issued by Glavgosexpertiza of Russia, delivery of process equipment and materials above and below zero, designer’s supervision over construction, carrying out of installation works and commissioning, start-up of the facility with further ramp-up, achievement of qualitative and quantitative indicators of market products
Capacity 2.4 bln m3/year
Year 2010-2012

 

Customer
OAO SibuTumenGaz
Work description
«Construction of a new line for processing of 2 bln m3 of Uzhno-Balyksky GPC hydrocarbon gas»
Types of works performed
Carrying out functions of General designer, development of design and detail documentation, receipt of approval issued by Glavgosexpertiza of Russia, delivery of process equipment and materials above and below zero, designer’s supervision over construction, carrying out of installation works and commissioning, start-up of the facility with further ramp-up, achievement of qualitative and quantitative indicators of market products.
Capacity
2 bln m3/year for hydrocarbon gas.
Year
2010-2012

 

Customer LLC Lengiproneftehim
Work description «Conduction of strength calculation of scrubber/reactor, heater and gasifier as a part of the facility: Combined unit No. 1. Facility 110-10. Section 5000 – Flexicoking at LLC RN-Tuapsinsky NPZ»
Types of works performed Carrying out complex calculations, confirming reliability and working efficiency of elements of the body and supporting structure of the units.
Year 2015

 

Customer
OAO GIPROTUMENNEFTEGAZ (ZAO Rospan International (OAO TNK-ВР Holding))
Work description
«Construction of gas cooling station and deethanization compressor station at Vostochno-Urengoisky licensed site»
Types of works performed
Development of design documentation, receipt of approval issued by Glavgosexpertiza of Russia
Capacity
900 mln m3/year
Year
2011-2012

 

 

Page   1   2   3   4   5   6   7   8