Reference page 4

Reference page 4

Customer LLC KINEF
Work description Carrying out of technical documentation on survey, calculation and issue of recommendations on elimination of piping vibration of compressor PK-1, 2 of Neuman&Esser Comany (Germany) of unit LG35-8/300B, department No.5, LLC Kinef
Types of works performed
Technical report
Year 2009

 

Customer LLC Usolye-Sibirsky Silikon
Work description Development of detail documentation on polycrystalline silicon production facility at the industrial area of LLC Usolye-Sibirsky Silikon
Types of works performed Detail documentation development
Year 2009

 

Customer OAO GSPI
Work description Creation of pilot polycrystalline silicon production facility with capacity up to 3000 tons per year at the industrial area of LLC Usolye-Sibirsky Silikon
Types of works performed Detail documentation development
Capacity 3000 tons/year
Year 2009

 

Customer LLC Usolye-Sibirsky Silikon
Work description Unit of chlorsilane condensation and separation of vapour-gas mixture components of pilot polycrystalline silicon production plant
Types of works performed Technical design development
Year 2009

 

Customer ZAO Severorgsintez
Work description Gas Processing Industrial Complex UPBS-100. Commodity park of Novy Urengoy
Types of works performed Detail documentation development
Year 2009 год

 

Customer ZAO Severorgsintez
Work description Gas Processing Industrial Complex UPBS-100.Production area of Novy Urengoy
Types of works performed Detail documentation development
Year 2009 год

 

Customer OAO SIBUR-Portenergo
Work description Liquefied petroleum gases (LPG) transferring complex in Ust-Luga sea port. Process units and structures. Isothermal storage park
Вид работ Feasibility study
Year 2009

 

Customer OAO Surgutneftegaz
Work description Development of design documentation of gas metering station facility. Reconstruction for OAO Surgutneftegaz
Types of works performed Development of design and detail documentation
Year 2009

 

Customer ZAO Severorgsintez
Work description Gas Processing Industrial Complex UPBS-100
Types of works performed Development of design and detail documentation, passing of expert review, development of process procedure of the full profile gas processing plant, packaged equipment supply, designer’s supervision over construction and installation supervision over commissioning
Capacity 1.5 bln m3/year
Year 2008

 
 
Customer Unitary Subsidiary Enterprise Shurtanneftegaz
Work description Conduction of works on UPBS-3 units capacity increase (the 3rd and 4th lines) SP LLC SHORTAN GAS MAHSULOT. Stage 1 – Adjustment of optimal operation modes of the units. Stage 2 –development of detail design on the option selected
Types of works performed Detail design development, detail documentation development, process procedure development, designer’s supervision over construction
Capacity 3.0 bln m3/year
Year 2008

 

 
Customer OAO Surgutneftegaz
Work description Rebuild of furnace blocks of crude oil distillation and bitumen production department
Types of works performed Development of design and detail documentation, receipt of approval issued by Glavgosexpertiza of Russia
Capacity furnace P-1 – 168 mln kg/year; furnace P-3 – 113 mln kg/year
Year 2008

 

 
Customer DOAO Gazproektinzhiniring
Work description Calculation of stressed state of compressor 6PК32 piping of OAO Rumo for GPA-4РMP compressor station Rozhdestvenskaya outside station coverage, determination of piping natural frequencies, selection and arrangement of supports for turning out pipeline system frequencies
Types of works performed Detail documentation development
Year 2008

 

Customer ОАО Saturn-gazovye turbiny
Work description Development of technical documentation on compressor 6PK32 compressor gas piping of Rumo company for Stavropolsky underground gas storage station
Types of works performed Technical documentation development
Year 2008

 

Customer ОАО NPO Saturn
Work description Development of technical documentation (technical designs) of suction and discharge buffer vessels of gas pipeline headers for reciprocating compressor Ariel of gas pumping unit GPA-4РMP-02 for compressor station Kaliningradskoe underground gas storage facilitiy
Types of works performed Technical documentation development
Year 2008

   

Customer ООО «SHORTAN GAS MAHSULOT»
Work description Construction of propane-butane recovery unit on the basis of feedstock of Shurtansky Group fields (the 3rd and 4th lines)
Types of works performed Detail design development
Year 2008

 

 