Customer OAO SiburTumenGaz
Work description Production facilities for processing of 2.0 bln m3/year of hydrocarbon gas at industrial site of Yuzhno-Balyksky gas processing complex
Types of works performed Technical design development
Year 2008

 

Customer OAO SiburTumenGaz
Work description Gas Processing Unit No. 2; Low-temperature condensation unit and external equipment.
Reconstruction at the industrial site of Gubkinsky GPP
Types of works performed Technical design development
Year 2008

 

Customer OAO SiburTumenGaz
Work description Analysis of design solutions of UPG-1 unit retrofit at Yuzhno-Balyksky gas processing complex
Types of works performed Feasibility study
Year 2008

 

Customer OAO SiburTumenGaz
Work description Modernization of low temperature condensation unit UPG-2 of Gupkinsky GPC
Types of works performed Feasibility study
Year 2007

 

Customer OAO Surgutneftegaz
Work description Development of design documentation on furnace block of crude oil distillation and bitumen production department. Reconstruction for OAO Surgutneftegaz
Types of works performed Design and detail documentation
Year 2007

 

Customer ZAO Severorgsintez
Work description Development of oil-gas condensate pools of Vostochno-Urengoyskoe and Severo-Esetinskoe fields. Gas Processing Industrial Complex UPBS-100
Types of works performed Engineering and geological surveys
Year 2007

 

Customer ZAO Severorgsintez
Work description Development of detail documentation of Gas Processing Industrial Complex UPBS-100. Auxiliary facilities in Novy Urengoy
Types of works performed Detail documentation
Year 2007

   

Customer OAO Giprospetsgaz
Work description Calculation of pipeline stressed state, determination of piping natural frequencies, selection and arrangement of supports for turning out frequencies of pipeline system of compressors JGZ/6-2 of Ariel company for GPA-4RMP of Kaliningradskaya compressor station outside station coverage
Types of works performed Detail documentation development
Year 2007

  

Customer OAO Giprospetsgaz
Work description Development of action plan and technical solutions on reduction of piping vibrations of Ariel JGB/6 compressors at Nevskaya underground gas storage station (the 3rd line)
Types of works performed Detail documentation development
Year 2007
 
  
Customer OAO SiburTumenGaz
Work description Analysis of design solutions of UPG-1 unit retrofit at Yuzhno-Balyksky gas processing complex
Виды работ Analysis of design solutions
Производительность 1.5 bln m³/year
Year 2007

   

Customer OAO GAZPROM PROMGAZ
Work description Performing technical and economic calculations to assess the advisability of helium recovery at helium-bearing fields of hydrocarbons in the Eastern Siberia and Sakha republic (Yakutia)
Types of works performed Technical and economic calculations
Производительность 3.0 bln m3per year
Year 2007

  

Customer ОАО Angarsky zavod polimerov
Work description Issue of recommendations on re-piping of cascade II compressor of LDPE production at OAO Angarsky zvod polimerov
Types of works performed Development of recommendations
Year 2007

 

Customer «ZEROMAX GMBH» (Switzerland)
Work description Recovery unit of propane, butane and their mixes on the basis of feedstock of Shurtanskaya group
Types of works performed Preliminary feasibility study
Year 2006

 

 