Reference page 7

Reference page 7

Customer LLC Orenburggazprom
Work description Conduction of calculations for compliance with the requirements of cl. 2.33 of rules PB 03-582-03 of the existing buffer vessels of compressors 4ГМ16-14/15-104М1
Types of works performed Research work
Year 2005

 

Customer LLC Tomskneftehim
Work description Development of detail documentation for the facility –unit of additional compressor of cascade I of compression division, dept. 408, polyethylene production
Types of works performed Detail documentation development
Year 2005

 

Customer OAO Surgutneftegaz
Work description Automation system of gas processing and compression units No. 1, 2 of Gas processing directorate of OAO Surgutneftegaz (Nitrogen furnace protection system)
Types of works performed Detail design
Year 2005

 

Customer FGUP Krasnoyarsky mashinostroitelny zavod
Work description Fabrication of hydrogen evolution unit
Types of works performed Technical design
Year 2005

 

Customer ОАО Zapsibgazprom
Work description Expert review of warehouses being built: automated silo warehouse for polyethylene storage and warehouse of packed storage
Types of works performed Development of plot plan and cost estimates
Year 2005

 

Customer National Association for Subsoil Use Auditing for “Itera”
Work description Feasibility study for development of Bratsk field without helium recovery and with commercial helium production
Types of works performed Feasibility study
Year 2005

 

Customer OAO Surgutneftegaz
Work description Gas processing facility No.3 with turbo-expander
Types of works performed Detail design
Year 2004

 

Customer OAO Surgutneftegaz
Work description Designer's supervision over manufacturing of process equipment for Gas processing facility No.3 with turbo-expander OAO Surgutneftegaz
Types of works performed Designer's supervision
Year 2004

 

Customer ZAO ENERGOTRASTINVEST
Work description Separator for separation of brine (water solution NaCl) of gas phase (natural gas) during construction of Volgogradskое underground gas storage facility
Types of works performed Technical design development
Year 2004

 

Customer OAO Surgutneftegaz
Work description Technical designs on process equipment for Gas processing facility No.3 with turbo-expander OAO Surgutneftegaz
Types of works performed Technical designs development
Year 2004

 

Customer LLC Orenburggazprom
Work description Process procedure for propane cooling unit operation of the 1st line of the Helium plant
Types of works performed Development of process procedure
Year 2004

 

Customer LLC Orenburggazprom
Work description Opinion as for possibility of low-temperature absorption arrangement with usage of pentane-hexane fraction as an absorbent
Types of works performed Conduction of checking calculations
Year 2004

 

Customer LLC Orenburggazprom
Work description Development of natural gas feed scheme to low-pressure methane faction
Types of works performed  
Year 2004

 

Customer LLC Orenburggazprom
Work description Review of possible Karachagansky gas processing options at the rebuilt units of the 1st line of the Gas plant of LLC Orenburggazprom
Types of works performed Feasibility study
Year 2004

 

Customer OAO Surgutneftegaz
Work description Automation system of gas processing and compression units No. 1, 2 of Gas processing directorate of OAO Surgutneftegaz (Nitrogen furnace protection system)
Types of works performed Design and detail documentation development, passing of expert review, process equipment delivery, designer’s supervision over construction, carrying out of pilot testing
Capacity 4.2 bln m3/year
Year 2003-2005

 

Customer Oil company YUKOS
Work description Petrolium gas separation unit with turbo expanding cooling cycle for justification of feasibility of Yugansky gas processing plant construction
Capacity 3 bln m3/year
Year 2003

 

Customer ITERA International Energy L.L.C
Work description Estimation of helium refining unit cost at Bratsk gas-condensate field
Types of works performed Feasibility study
Year 2003

  

Customer OAO GIPROTYUMENNEFTEGAZ
Work description Associated petroleum gas utilization system of Priobskoe and Prirazlomnoe fields
Types of works performed Design on gas dryer, where the gas is compressed at compression station of gas utilization system of Priobskoe and Prirazlomnoe fields
Year 2003

 

Customer LLC Orenburggazprom
Work description Detail design on reference of column K4/2 with external reboilers T22/1, T22/2 and vessel E10 of the ethane block of units U-410, 420, 430 of the second line of Orenburg helium plant
Types of works performed Purpose of ethane block retrofit of units U-410, 420, 430 was to increase safe operation, reduce costs of equipment repair, extend range of vapour and liquid load in the column with provision of brand A commercial ethane quality
Year 2002 – 2003

  

Customer LLC Orenburggazprom
Work description NGL Plant with usage of Russian turbo-expander unit
Capacity 3 bln m3/year (375000 m3/h) for natural gas
Year 2001

 

 