Contacts

Russia,
199155, St.Petersburg,
Uralskaya ul., 19, letter D, bld. 5

Tel.: +7(812) 327-7960
Fax: +7(812) 327-7692

 

office@niihimmash.com

 

 

website clock часы для сайтов
 


Reference page 8

Reference page 8

Customer
LLC Orenburggazprom
Work description
Retrofit of lines 1, 2, 3 of the Helium plant. Development and reference of column K-5 external reboiler of Helium blocks of dept. 410, 420, 430
Types of works performed
Detail design
Year
2004

 

Customer
LLC Orenburggazprom
Work description
Retrofit of lines 1, 2, 3 of the Helium plant. Development of detail documentation on reference of packaged upgraded column K-4/2 with two reboilers Т-22/1, Т-22/2 and vessel E-10 of the ethane block of unit No.21 of dept. 430 of the Helium plant, LLC Orenburggazprom
Types of works performed
Detail documentation development
Year
2004

 

Customer
LLC Orenburggazprom
Work description
Retrofit of lines 1, 2, 3 of the Helium plant. Reconstruction of helium block No.2 for increase of ethane, NGL yield and elimination of helium yield
Types of works performed
Detail documentation development
Year
2004

 

Customer
LLC NIIgazekonomika
Work description
Justification of natural gas liquefaction and storage process for export supplies from Ust-Luga sea port
Types of works performed
Feasibility study
Year
2004

 

Customer
OAO Surgutneftegaz
Work description
Automation system of gas processing and compression units No. 1, 2 of Gas processing directorate (Metering stations of associated petrolium gas, NGL, commercial propane/butane mix, propane production, off-spec products of commercial propane/butane mix) of OAO Surgutneftegaz
Types of works performed
Detail design
Year
2003

 

Customer
LLC Orenburggazprom
Work description
Development of process procedure for engineering of retrofit of booster compressor station I, II with replacement of electrically driven reciprocating compressors with centrifugal ones with gas turbine drive
Types of works performed
Procedure development
Year
2004

 

Customer
LLC NIIgazekonomika
Work description
Justification of natural gas liquefaction, storage and regasification process for covering of peak gas consumption in the North-West region
Types of works performed
Justification
Year
2004

 

Customer
OAO Surgutneftegaz
Work description
Railway siding with gas processing facility station and loading rack
Types of works performed
Development of front-end engineering
Year
2003

 

Customer
OAO Giprotumenneftegaz for OAO Yuganskneftegaz
Work description
Associated petrolium gas utilization system of Priobskoe and Prirazlomnoe fields
Types of works performed
Detail design
Year
2003

 

Customer
OAO Surgutneftegaz
Work description
Commodity park No.1 Reconstruction
Types of works performed
Detail design
Year
2003

 

Customer
OAO Giprotumenneftegaz for OAO Yuganskneftegaz
Work description
Process unit of petroleum gas separation with turbo expanding cooling cycle as a part of preliminary separation unit, dryer, pre-cooling unit, turbo-expander unit, rectification unit, market products purification unit, propane cooling unit block
Types of works performed
Feasibility study
Year
2003

 

Customer
LLC Orenburggazprom
Work description
Retrofit of lines 1, 2, 3 of the Helium plant. Upgrade of process equipment of unit No.21 of dept. 410 (Packaged upgraded column K-4/2 with two external reboilers T-22/1, T-22/2 and vessel E-10 with their reference to unit No. 21 of dept. 410 of the Helium plant)
Types of works performed
Detail documentation development
Year
2003

 

Customer
ITERA International Energy L.L.C
Work description
Technical solutions and cost estimation of equipment for helium refining unit of Bratsk gas-condensate field
Types of works performed
Feasibility study
Year
2003

 

Customer
OAO Surgutneftegaz
Work description
Process gas pipeline with separator No. 9 of gas metering unit for compressors intake of gas processing facility c-103
Types of works performed
Detail design development
Year
2002

 

Customer
LLC Orenburggazprom
Work description
NGL plant from natural gas with usage of Russian turbo-expander unit
Types of works performed
Detail design development
Year
1998 - 2001

 

Customer Unitary Subsidiary Enterprise Shurtanneftegaz
Work description Propane-butane recovery unit from natural gas
Types of works performed Development of design and detail documentation
Capacity Capacity as for natural gas is 3.0 bln m3/year, as for propane-butane mixture, 68 ths./year
Year 1995
Start-up The facility was started in summer 1997

 

 

Page   1   2   3   4   5   6   7   8