Year |
Project |
Technical parameters |
Carried out works |
Project status |
Customer |
2009 |
Installation of low temperature condensing and outer equipment. Reconstruction of industrial site of Gubkinsky GPK JSC |
Output is 2 bln.m3/year at hydrocarbon gas |
Development of design and working documentation, engineering support and equipment delivery, support assembly and commissioning works, designer supervision. The following was delivered: Column equipment–1 pcs. capacitive equipment –5 pcs. Heat exchanging equipment – 2 pcs. Air cooling equipment – 9 pcs. Turboexpansion machine – 1 pcs. Pump equipment – 4 pcs. Industrial regulating, stop, safety fittings – 268 pcs. Instrumentation – 144 pcs. APCS – 1 pcs. Analyzing equipment – 28 pcs. |
Object is put into operation in October 2010 |
SIBURTUMENGAS JSC |
2009 |
Plant for processing of 2,0 bln.m3/year of hydrocarbon gas on industrial site of |
Output 2 bln.m3/year at hydrocarbon gas |
Development of design and working documentation. |
Documentation is accepted by the Customer |
SIBURTUMENGAS JSC |
2008 |
Working design of experimental-industrial manufacturing for polycrystalline silicon production |
Output 300 t/year |
Development of design and working documentation, engineering support and equipment delivery, support assembly and commissioning works, designer supervision.
The following was delivered: capacitive equipment – 9 pcs
|
Object is put into operation in April 2010 |
Usolie-Sibirsky Silicon LLC |
2008 |
Industrial manufacturing of polycrystalline silicon |
Output 3000 t/year
|
Development of design and working documentation, engineering support and equipment delivery, erection supervision and commissioning, designer supervision
The following was delivered: Heat-exchanging equipment – 11 pcs. Columns – 4 pcs. capacitive equipment – 15 pcs. Air cooling equipment – 5 pcs. mass transfer plates Contact devices Frequency converters Pump equipment – 22 pcs. Industrial regulating, stop, safety fittings – 634 pcs.
|
Project passed Main state expertise
construction is in process |
Usolie-Sibirsky Silicon LLC |
2008 |
Complex on natural gas processing with PBТ and stable gas petrol extraction. Industrial area includes stock tanks, automatic pouring in and set of auxiliary objects.
|
Output 1,2 bln.m3/year at natural gas |
Development of design and working documentation, engineering support and equipment delivery, structural and assembly works, support assembly and commissioning works, designer supervision.
The following was delivered: Heat-exchanging equipment – 8 pcs. Columns – 2 pcs. capacitive equipment – 42 pcs. Air cooling equipment – 8 pcs. Turboexpansion machine – 1 pcs. Ball reservoirs – 10 pcs. Fire reservoirs – 4 pcs. Diesel power station AKSA Membrane gas separating plant МВ-0,1 Compressing station – 1pcs. Nitrogen station – 1 pcs. Pump equipment – 13 pcs. Heat supply boiler room – 1 pcs. Furnaces – 2 pcs. Regulating, shut-off and safety fittings of stock tanks and manufacturing – 1006 pcs. APCS – 1 pcs. Instrumentation - 628 pcs. Analyzing equipment – 9 pcs.
|
Project passed Main state expertise
Construction is on final stage |
Severorgsintes CJSC |
2007 |
Design of turns 3 and 4 of PBТ extraction plant УPBС-3. |
Output of each plant 3 bln.m3/year at natural gas |
Development of design and working documentation. |
Object is put into operation in September 2008 |
ZEROMAX Uzbekistan |
2005 |
Reconstruction of plants of production and processing of low pressure polyethylene, ethylene, and construction of plants Bisphenol- А and Polycarnonates for Kazanorgsintes JSC |
Equipment delivery. “Low pressure polyethylene” “Bisphenol-А”, “Polycarbonate”, “Ethylene”.
|
Development. manufacturing and delivery of unique licensed equipment complying with ASME standard with adaptation to actual norms of Russian regulations and normative-technical documentation requirements.
The following was delivered:
For plant “Low pressure polyethylene”: Heat-exchangers – 4 pcs. Capacitive equipment – 43 pcs. Air cooling equipment – 6 pcs.
For plant “Bisphenol-А”: Heat-exchanging equipment – 55 pcs. Columns – 6 pcs. Capacitive equipment – 72 pcs. Reactors – 5 pcs.
For plant “Polycarbonate”: Heat-exchanging equipment – 87 pcs. Columns – 13 pcs. Capacitive equipment – 163 pcs. Reactors – 5 pcs.
For plant “Ethylene” : Heat-exchanging equipment – 30 pcs. Columns – 3 pcs. Capacitive equipment – 24 pcs. Air cooling equipment – 6 pcs.
|
Object is put into operation in September 2008 |
Kazanorgsintes JSC |
2005 |
Project “Helium production” within “Complex of natural gas processing for ethylene and helium production", Saiansk |
Output on initial gas 2.5 - 4 bln.m3/year |
Development of design documentation. |
Documentation is accepted by the Customer |
Krioplast CJSC |
2003 |
Associated petroleum gas processing plant with turboexpansion machine (Working design ) |
Output on initial gas |
Development of design and working documentation. |
Object is put into operation in June 2006 |
Surgutbeftegas JSC |
2002 |
Reconstruction of Ist turn of Orenburg Helium Plant (Working design ) |
Output 3 bln.m3/year at natural gas |
Development of design and working documentation. |
Documentation is accepted by the Customer |
Orenburggasprom LLC |
2001 |
Plant of ethane and BFLC extraction from natural gas (Working design ) |
Output at natural gas 3,0 bln.m3/year |
Development of design and working documentation. |
Documentation is accepted by the Customer |
Orenburggasprom LLC |
1995 |
Plant for propane-butane mixture production from natural gas (Working design ) |
Output at natural gas 3,0 bln.m3/year, |
Development of design and working documentation. |
Object is put into operation on summer 1997 |
Shurtanneftegas GPU, Karshi, Uzbekistan |