Reference

Reference

Year

Project

Technical parameters

Carried out works

Project status

Customer

2009

Installation of low temperature condensing and outer equipment. Reconstruction of industrial site  of Gubkinsky GPK JSC

Output is 2 bln.m3/year at hydrocarbon gas

Development of design and working documentation, engineering support and equipment delivery, support assembly and commissioning works, designer supervision.

The following was delivered:

Column equipment–1 pcs.

capacitive equipment –5 pcs.

Heat exchanging equipment –  2 pcs.

Air cooling equipment – 9 pcs.

Turboexpansion machine – 1 pcs.

Pump equipment – 4 pcs.

Industrial regulating, stop, safety fittings – 268 pcs.

Instrumentation – 144 pcs.

APCS – 1 pcs.

Analyzing equipment – 28 pcs.

Object is put into operation in October 2010

SIBURTUMENGAS JSC

2009

Plant for processing of  2,0 bln.m3/year of hydrocarbon gas  on industrial site of  
Ujno-Balyksky GPK

Output 2 bln.m3/year at hydrocarbon gas

Development of design and working documentation.

Documentation is accepted by the Customer

SIBURTUMENGAS JSC

2008

Working design   of experimental-industrial manufacturing for polycrystalline silicon production

Output 300 t/year

Development of design and working documentation, engineering support and equipment delivery, support assembly and commissioning works, designer supervision.

 

The following was delivered:

capacitive equipment  – 9 pcs

 

Object is put into operation in April 2010

Usolie-Sibirsky Silicon LLC

2008

Industrial manufacturing  of polycrystalline silicon

Output 3000 t/year

 

Development of design and working documentation, engineering support and equipment delivery, erection supervision and commissioning, designer supervision

 

The following was delivered:

Heat-exchanging equipment – 11 pcs.

Columns – 4 pcs.

capacitive equipment  – 15 pcs.

Air cooling equipment – 5 pcs.

mass transfer plates

Contact devices

Frequency converters

Pump equipment – 22 pcs.

Industrial regulating, stop, safety fittings – 634 pcs.

 

Project passed Main state expertise

 

construction is in process

Usolie-Sibirsky Silicon LLC

2008

Complex on natural gas processing with PBТ and stable gas petrol extraction. Industrial area includes stock tanks, automatic pouring in and set of auxiliary objects.

 

Output 1,2 bln.m3/year at natural gas

Development of design and working documentation, engineering support and equipment delivery, structural and assembly works, support assembly and commissioning works, designer supervision.

 

The following was delivered: 

Heat-exchanging equipment – 8 pcs.

Columns – 2 pcs.

capacitive equipment  – 42 pcs.

Air cooling equipment – 8 pcs.

Turboexpansion machine – 1 pcs.

Ball reservoirs – 10 pcs.

Fire reservoirs – 4 pcs.

Diesel power station AKSA

Membrane gas separating plant МВ-0,1

Compressing station – 1pcs.

Nitrogen station – 1 pcs.

Pump equipment – 13 pcs.

Heat supply boiler room – 1 pcs.

Furnaces – 2 pcs.

Regulating, shut-off and safety fittings of stock tanks and manufacturing – 1006 pcs.

APCS – 1 pcs.

Instrumentation  - 628 pcs.

Analyzing equipment – 9 pcs.

 

Project passed Main state expertise

 

Construction is on final stage

Severorgsintes CJSC

2007

Design of turns 3 and 4 of PBТ extraction plant УPBС-3.

Output of each plant 3 bln.m3/year at natural gas

Development of design and working documentation.

Object is put into operation in September 2008

ZEROMAX

Uzbekistan

2005

Reconstruction of plants of production and processing of low pressure polyethylene, ethylene, and construction of plants Bisphenol- А and Polycarnonates for Kazanorgsintes JSC

Equipment delivery.
for plants

“Low pressure polyethylene”

“Bisphenol-А”, “Polycarbonate”, “Ethylene”.

 

Development. manufacturing and delivery of unique licensed equipment complying with ASME standard with adaptation to actual norms of Russian regulations and normative-technical documentation requirements.

 

The following was delivered:

 

For plant

“Low pressure polyethylene”:

Heat-exchangers – 4 pcs.

Capacitive equipment  – 43 pcs.

Air cooling equipment – 6 pcs.

 

For plant “Bisphenol-А”:

Heat-exchanging equipment – 55 pcs.

Columns – 6 pcs.

Capacitive equipment  – 72 pcs.

Reactors – 5 pcs.

 

For plant “Polycarbonate”:

Heat-exchanging equipment – 87 pcs.

Columns – 13 pcs.

Capacitive equipment  – 163 pcs.

Reactors – 5 pcs.

 

For plant “Ethylene” :

Heat-exchanging equipment – 30 pcs.

Columns – 3 pcs.

Capacitive equipment  – 24 pcs.

Air cooling equipment – 6 pcs.

 

Object is put into operation in September 2008

Kazanorgsintes JSC

2005

Project “Helium production” within “Complex of natural gas processing for ethylene and helium production", Saiansk

Output on initial gas 2.5 - 4 bln.m3/year

Development of design documentation.

Documentation is accepted by the Customer

Krioplast CJSC

2003

Associated petroleum gas processing plant with  turboexpansion machine (Working design )

Output on initial gas
3 bln.m3/year

Development of design and working documentation.

Object is put into operation in June 2006

Surgutbeftegas JSC

2002

Reconstruction of Ist turn of Orenburg Helium Plant (Working design )

Output 3 bln.m3/year at natural gas

Development of design and working documentation.

Documentation is accepted by the Customer

Orenburggasprom LLC

2001

Plant of ethane and BFLC extraction from natural gas (Working design )

Output at natural gas 3,0 bln.m3/year

Development of design and working documentation.

Documentation is accepted by the Customer

Orenburggasprom LLC

1995

Plant for propane-butane mixture production from natural gas (Working design )

Output at natural gas 3,0 bln.m3/year,
68 thousand t/year at propane-butane mixture

Development of design and working documentation.

Object is put into operation

on summer 1997

Shurtanneftegas GPU, Karshi, Uzbekistan